English /
Period when Measured (Start)
Database table | Road |
Database variable name | Period_when_measured_start |
Introduction date | 2009-07-01 |
Expiration date | Still active |
Short description
Start date for traffic measurements.
Values
Date (yyyymmdd)
Description
The start date of the time period that the average annual daily traffic was measured. It is noted for each AADT value.
Short description
<< Traffic Flow when Measured (Night) | DaCoTa Manual | Period when Measured (End) >>